11.8 Maintenance
11.8.1 Post Implementation Review
This is carried out several weeks or months after the system has been
implemented.
Small changes may need to be made:
For example:
- Correct program errors
- Amend clerical procedures
- Modify screen and report formats
11.8.2 Perfective Maintenance
Here we are concerned with taking an acceptable system and making it
better.
11.8.3 Adaptive Maintenance
As the system requirements change, the system needs updating.
11.8.4 Corrective Maintenance
There may still be problems with our system that need to be corrected.